Back to IFRS and IAS study guides

IAS 37 · Provisions and Contingencies

Recognise a provision when a past event creates a present obligation with a probable outflow and a reliable estimate. Measure at the best estimate and discount when material. Contingent liabilities generally require disclosure unless outflow is remote.

Decide what exists at close

A provision is a liability with uncertain timing or amount. Recognise it when a past event has created a present legal or constructive obligation, an outflow is probable, and the amount can be reliably estimated. A constructive obligation can arise from a sufficiently specific practice or communication that creates valid expectations.

Distinguish contingencies

A possible obligation or an unrecognised present obligation is generally disclosed unless the outflow possibility is remote. A contingent asset is disclosed when an inflow is probable and recognised only when the inflow becomes virtually certain.

Measure the provision

Use the best estimate at reporting date. For a population of similar obligations, expected value can combine the outcomes and probabilities. A single obligation may require considering the most likely outcome alongside other possibilities. Discount if the time value of money is material. Review and adjust each reporting period.

Apply to contracts and restructuring

Future operating losses do not create a provision. For an onerous contract, consider the unavoidable cost of fulfilling or exiting it and test the related assets for impairment before recording the provision where applicable. Restructuring needs a sufficiently detailed plan and a valid expectation it will be carried out.

Report and check

For relevant classes, explain movements, nature, expected timing, major uncertainties and expected reimbursements. Keep support for probability and cost assumptions.

Worked example

The café has sold equipment with warranties. If claims across the population are probable, estimate the obligation using the range of outcomes and their likelihoods.

For assurance warranties on 100 units, assume 90% require no work, 8% cost $100 each and 2% cost $500 each. The expected cost is $18 per unit, so the provision is $1,800. Dr warranty expense / Cr warranty provision.

Application point

A plan to spend money next year generally creates no present obligation on its own.

Self-check

Management approves next year’s training budget. No contracts have been signed and no obligation has been communicated. Is there a provision?

Show answer

No. Budget approval alone has not created a present obligation arising from a past event.

Build a warranty provision from claims data

A company sells 1,000 products with assurance-type warranties. It expects 80% of units to need no repair, 15% to need a $100 repair and 5% to need a $300 repair. Assume discounting is immaterial. The expected cost is $30 per unit, or $30,000 in total.

At recognition, debit warranty expense and credit warranty provision for $30,000. When paying $4,000 of qualifying claims, debit the provision and credit cash. The balance before re-estimation is $26,000. Review estimates at each reporting date and use the provision only for the costs it was recognised to cover.

What to check at work

Document the event creating the obligation, the probability assessment and the calculation. A contingent liability is generally disclosed unless the possibility of an outflow is remote. A contingent asset is disclosed when inflow is probable, and an asset is recognised when inflow is virtually certain.

Try it yourself

Can a management budget for next year’s routine maintenance create a provision today?

Show answer

No. A future spending plan alone does not create a present obligation from a past event.

IFRS Foundation · Standards Navigator